
Panels and transfer switches in Juan Dolio
The beachfront towers and condominiums of Juan Dolio have apartments used mostly at weekends and on holiday, and common areas that run all year. For them we assemble meter enclosures, common-area panels and transfer switches, and we look after them with the Plan Energía.
One tower, many meters
Every apartment has its meter, and the meter enclosure gathers them in one cabinet with reading windows, in the electrical room of each building. We assemble it to fit the number of units. The common-area panel feeds lifts, pumps, the pool and the corridor and car-park lights.
When the power goes
In a tower, the transfer switch moves the load to the standby generator when the power goes and moves it back when it returns. A monitored transfer switch alerts the manager’s phone when the generator starts, when it fails or when it is due for maintenance, even if nobody is in the building.
Plan Energía by the sea
The sea breeze carries humidity and salt into electrical rooms. The Plan Energía checks the panels with a thermal camera to find hot spots, tightens connections, cleans, tests the transfer switch with the generator and delivers a report with measurements that the administration can show the owners.
Every panel with its plate
Every panel carries its QR-code plate. Scan it and the technician or the manager sees the date and place of fabrication, the tests carried out, the warranty, the use and care manual and the maintenance history, and can request service with a button.
When the condominium’s administration changes, the history stays with the panel.
Quote
Send us the number of apartments, the single-line diagram or photos of the electrical room. We send you a clear price, with what it includes and the delivery time. We work all over the Dominican Republic, and the panels leave our plant in Bávaro assembled and labeled.
Frequently asked questions
Do you make meter enclosures for towers?
Yes, to fit the number of units and the electrical room.
What does the Plan Energía include?
A thermal-camera check, tightening of connections and cleaning, a transfer switch test with the generator and a report with measurements.
Can the manager get alerts?
Yes. The monitored transfer switch alerts the phone when the generator starts, fails or is due for maintenance.
Tell us about your project
Send us a drawing, a photo or a hand sketch. We reply with a clear price, with what it includes and the delivery time.
You may also be interested in
Electrical panels and enclosuresWhere we work
Façades and lattice screens in Juan Dolio
Laser-cut pierced façades, AC unit covers and lattice screens for apartment towers and beach condominiums in Juan Dolio.
We call you
Leave your name and WhatsApp. We call you during office hours.
Have a project? Write to us
Leave an e-mail or a phone number and we reply during office hours.

