Aluzinc roofs for hotels and resorts
A resort has dozens of different roofs: villas, beach bars, covered walkways, service areas and car parks. We make the aluzinc sheet to fit each of them and plan the replacement by zones, so the hotel keeps selling rooms.
A roof for every part of the hotel
Villas and room blocks usually call for tile-profile aluzinc, which gives the look of a traditional roof without the weight of clay tile. Covered walkways, carports and the service area work well with plain aluzinc. Either way we choose with your design team the colour that keeps the resort’s image.
When new framing is needed, for example to cover a walkway between buildings or a loading area, we fabricate it in steel in our plant together with the sheets.
Replacement in stages, without closing the hotel
Re-roofing a resort in operation is done zone by zone. We measure each building with digital equipment, make the sheets in batches and install them following the occupancy calendar the hotel gives us. That is how we worked at Villa Caletón 55, in Cap Cana: roofs by zones, delivered in stages.
Because every sheet arrives cut to the length of its slope, time on the roof is shorter and the noise of the work is concentrated into a few hours per zone.
Salt air is unforgiving
Beachfront hotels take salt air every day. The Coast Plan checks for rust and corrosion, tightens the bolts and delivers a report with photos, so the hotel’s maintenance team knows which roof to deal with first.
Every roof carries its QR-code plate, with the date of manufacture, the inspections and the maintenance history, readable from your chief engineer’s phone.
What to prepare before the quote
To quote a re-roofing job at a hotel it helps to receive the site plan or an aerial view, the list of buildings by zone and photos of the current roofs, above all ridges, gutters and the joints with walls. With that we schedule the site survey and send you a quote in stages, with what each stage includes and its delivery time, so your finance team can spread the investment across seasons.
Frequently asked questions
Can you replace the roofs with the hotel open?
Yes. We work by zones following the occupancy calendar the hotel gives us, with the sheets already made to measure.
Do you keep the resort’s colour?
Yes. We choose the colour with your design team; the colour chart is confirmed with the quote.
Do you offer roof maintenance?
Yes. The Coast Plan checks rust, corrosion and bolts, with a report and photos.
Tell us about your project
Send us a drawing, a photo or a hand sketch. We reply with a clear price, with what it includes and the delivery time.
You may also be interested in
Steel structures- For your industry
Service buildings for hotels and resorts
Steel buildings for hotel laundries, stores, workshops and maintenance, fabricated in Bávaro and erected by our own crew.
- For your industry
Metal pergolas for hotels and restaurants
Bolted metal louvered pergolas for restaurant terraces, pool areas and hotel outdoor lounges, made to measure.
For your industrySteel structure maintenance for beach hotels
Coast Plan for beach hotels: rust and salt-air corrosion checks, paint and anchor touch-ups, bolts and welds, and a report with photos.
Have a project? Write to us
Leave an e-mail or a phone number and we reply during office hours.
